Southern Reach Pipeline

Southern Reach Pipeline  - May 20, 2008

About Southern Reach Pipeline

The pipeline includes construction of approximately 24,410 feet of 72-inch diameter mortar lined and dielectric coated (ML&DCS) steel pipe and 430 feet of RCC Pipe. It also includes two trenchless crossings: a 430 lineal foot microtunnel under the Mokelumne River and a 240 lineal foot tunnel under Highway 12.

General Information

Contractor
Logo for Sundt

Construction completed in 2009

   Loading Map


Map created with Google Maps and My Maps Plus.