Brandt Flow Splitting Facility

About Southern Reach Pipeline

The Brandt Flow Splitting Facility involves the construction of a reinforced concrete flowmeter vault structure with two 54" lines and one 42" line. Each line will include valves, flowmeters, and other instruments. Work also includes connections to the three existing Mokelumne aqueducts.

General Information

Contractor
Balfour Beatty Logo

Construction completed in 2009